SciRisk Calculate your ESCRC
As of 2026-06-30| Model v5.4.2| Priors 2026.09-5| Calculated 2026-09-21| 100,000 paths · 95% · 365d| BETA Methodology

SciRisk 100 · Energy & Utilities · Rank 87 of 100

Iberdrola

IBE.MC · Spain · Energy & Utilities   SC1 Very Low

Economic Supply Chain Risk Capital
$14.6m
95% one-year Value-at-Risk · interval $14.4m to $15.1m (5.1% wide)
Risk Capital Intensity
0.031%
of $47.0bn revenue · rank #93 of 100
Global rank
#87
of 100 by ESCRC
Sector rank
#7
of 7 in Energy & Utilities
Expected Shortfall
$34.9m
Mean loss beyond ESCRC
Expected annual loss
$4.0m
Ordinary year
Revenue / COGS
47.0 / 33.0
USD bn · gross margin 30%
Suppliers modelled
10
2 correlated geographies

What does this ESCRC number mean?

An ESCRC of $14.6m is the estimated economic supply-chain risk capital requirement generated by the SciRisk ESCRC model for Iberdrola under the stated assumptions: a 365-day horizon, 100,000 simulated years, and the 95% tail of the resulting loss distribution. Beyond that threshold the average loss — the Expected Shortfall — is $34.9m; in an ordinary year the expected loss is $4.0m.

Value-at-Risk: the portfolio loss not exceeded with the chosen confidence level. Read as the ESCRC risk capital — the loss the firm should be prepared to absorb in a bad year. Model-implied and intended for screening and ranking, not a calibrated capital figure.

Supply Chain Risk Capital Profile

Where the risk capital comes from. Every column is a production-engine output for this network — nothing is inferred.

By tier

Tier 1
54%
Tier 2
42%
Tier 3
4%

Share of summed standalone VaR. Deeper tiers are attenuated by the engine's echelon buffer factors and capped by flow conservation.

By supplier geography

France
37%
China
33%
Germany
16%
Spain
11%
Switzerland
4%
Denmark
0%

Major-event risk is correlated within a geography group (rho = 0.35), so concentration here compounds.

By supplier industry

general mfg
37%
electronics assembly
33%
raw materials mining
19%
automotive
11%
energy equipment
0%

Buckets are the calibrated-priors industry classes that set each supplier's minor-event rate.

Largest supplier share
33%
Longi Green Energy
Top-3 concentration
70%
of summed standalone VaR
Tier-1 share of risk
54%
Direct suppliers
Diversification benefit
23.3%
vs. sum of standalone VaR
SupplierTierCountry ExposureUSD m Standalone VaRUSD m Expected lossUSD m Tail intensityrevenue-days RoESCRCx
Longi Green EnergySolar modules T1 China 990 6.2 0.8 1.6 68.0
Schneider ElectricElectrical systems T1 France 825 4.1 0.4 1.3 86.0
AurubisRefined copper T2 Germany 825 3.0 0.2 1.5 71.5
NexansCable/conductor T2 France 990 2.9 0.3 1.3 86.0
IngeteamBattery energy storage system (BESS) equipment for solar-plus-storage hybridization T2 Spain 495 2.1 0.2 1.8 59.2
GlencoreCopper concentrate T3 Switzerland 396 0.7 0.0 1.5 71.5
Siemens GamesaWind turbines T1 Spain 2310 0.0 0.8
VestasWind turbines T1 Denmark 1650 0.0 0.6
PrysmianPower cable T1 Italy 1320 0.0 0.4
ABBGrid automation/transformers T1 Switzerland 1155 0.0 0.4

Scenario Analysis — coming in Phase 2

Recovery-time, supplier-diversification, inventory and geographic-diversification scenarios for Iberdrola are not part of this release. The ESCRC Calculator already supports what-if analysis on a network you build yourself.

Sector peers

Nearest-ranked companies in Energy & Utilities. Iberdrola is highlighted.

Open in Compare
RankCompanyTickerCountrySectorRevenueUSD bnESCRCUSD mESCRC / Revenue%Risk GradeChange
33 Shell SHEL United Kingdom Energy & Utilities 284.0 92.4 0.033 SC1 Very Low ▲ +61.5%
45 BP BP United Kingdom Energy & Utilities 190.0 61.8 0.033 SC1 Very Low ▲ +66.6%
46 TotalEnergies TTE France Energy & Utilities 195.0 58.5 0.030 SC1 Very Low ▲ +52.0%
49 Chevron CVX USA Energy & Utilities 193.0 55.1 0.029 SC1 Very Low ▲ +27.7%
68 Enel ENEL.MI Italy Energy & Utilities 85.0 27.9 0.033 SC1 Very Low 0.0%
87 Iberdrola IBE.MC Spain Energy & Utilities 47.0 14.6 0.031 SC1 Very Low ▼ -7.8%

See this for your own supply chain

You are looking at Iberdrola's supply-chain risk capital: $14.6m against $47.0bn of revenue, driven mostly by Longi Green Energy and France. The calculator runs the same engine on a network you build yourself.

ESCRC calculated using SciRisk ESCRC Model v5.4.2 · calibrated priors 2026.09-5
Company data as of 2026-06-30 · ESCRC calculated 2026-09-21 · dataset 2026.09-23 Beta
Simulation
100,000 Monte Carlo paths · 95% confidence · 365-day horizon
Seed
20260821 · regional correlation ρ = 0.35
Input basis
Curated network, calibrated-prior parameters
Input fingerprint
2e9209550282
Input provenance for Iberdrola
Financials
Curated from the company's most recent reported full financial year, as filed.
Network
Curated from company supplier disclosure; purchase volumes declared as a share of reported COGS.
Parameters
lambda1/lambda2 = calibrated ESCRC priors 2026.09-5 bucket defaults; r1/r2 = median of the shipped production preset networks within the same industry x geography cell when that cell has enough independent data, else the same industry-only bucket median, or (for industries with no preset supplier coverage) a directly-cited external recovery-event duration where one was found; ic = the same preset-network median (no external benchmark exists for this parameter for any industry). All three clamped into externally-cited recovery-time/BI-loss bounds per field.
Fallback
Some suppliers resolve to an industry bucket with no preset coverage for revenue-at-risk fraction (energy equipment). This parameter has no external benchmark for any industry in this dataset, so it uses the median across all preset suppliers.
SciRisk ESCRC is an analytical estimate generated using the SciRisk Economic Supply Chain Risk Capital methodology. It is not a credit rating, investment recommendation or statement of financial condition. Figures are model-implied and intended for screening and comparison, not as calibrated capital requirements.

Beta / preliminary dataset. Company inputs are analyst-curated from public annual reports and public supply-chain disclosure. ESCRC itself is computed by the production ESCRC engine — only the INPUTS on this page are preliminary.